commercial // the herbert building
The Herbert Building, The Park
Carrickmines
The Perfect Building
The Herbert Buidling has been designed to accomodate flexible office layouts and energy efficient mechanical and electrical systems ensuring a healthy and productive work place which in turn creates value.
The Perfect Location
The Park, Carrickmines can be easily accessed from Dublin Airport, Dublin Port, Dun Laoghaire Portland all of the National Primary Routes via the M50. Dublin Bus serves Carrickmines with several bus routes and the Ballyogan Wood LUAS Green Line stop is immediately outside The Park Carrickmines.
Typical Floor Plan
The Herbert Building's floor plate has been designed to provide efficient flexible offices. The design is ideal for both open plan and cellular layouts. The floor plate also allows for easy subdivision should parties wish to sublet some space into which they can grow into later.
Floor by floor area breakdown
|
|
| (sq.m) |
GROSS |
| Ground Floor |
1505 |
| Floor 1 |
1494 |
| Floor 2 |
1494 |
| Floor 3 |
1494 |
| Floor 4 |
1432 |
| |
|
| TOTAL Floor Areas |
7417 |
Currently State Street Bank occupy Floors 2 & 3 and both Park Developments Group and Sysnet occupy Floor 4.

The Park - Carrickmines
Other buildings:
SALES ENQUIRIES:

Email: offices@savills.ie
Web: www.savills.ie